Project Overview
Process Pictures
Pictures After
Scope of Work
Good Life Construction removed the concrete entry deck and rebuilt its support and surface system. Approved additional work introduced two concrete footings, pressure-treated posts, an LVL beam and new deck joists. The work included tongue-and-groove plywood, Westcoat ALX waterproofing, wall and edge flashing, three connected linear drains, localized exterior patching and reinstallation of the existing railings.
Challenges
The concrete deck had sagged and held water above the garage. The rebuild required a lighter surface assembly, additional structural support, and careful integration with the garage-door framing, opener and tracks.
Solutions
Good Life Construction installed the new footing, post and beam assembly with joists and blocking to support the deck and garage-door equipment. Sloped plywood, Westcoat ALX and integrated drains addressed the deck surface and water management. The retained railings were reinstalled with sealed attachments.
Final Result
- New footings, posts, beam and joists reinforced the deck support.
- A rebuilt entry surface and reinstalled railings restored access.
- Waterproofing, flashing and connected drains addressed surface water management.